All case studies
Southwark · SE1·
Warehouse loft in Southwark: 50dB noise reduction
How we cut adjacent construction site from 86dB to 36dB using 10.8mm Stadip Silence with a 150mm decoupled air gap.
Before
86 dB
After
36 dB
Reduction
50 dB
Installation specification
Acoustic glass
10.8mm Stadip Silence
Air gap
150mm decoupled cavity
Windows treated
6 openings
Install time
2 days on site
Verified outcome
Work-from-home productivity restored during 18-month build.
"Piling rigs were making calls impossible. Now I forget they're there."
Have a similar property in Southwark?
Get a like-for-like quote based on this exact installation specification.