All case studies
Greenwich · SE10·
Mansion block flat in Greenwich: 44dB noise reduction
How we cut dlr viaduct & river traffic from 74dB to 30dB using 10.8mm Stadip Silence with a 120mm decoupled air gap.
Before
74 dB
After
30 dB
Reduction
44 dB
Installation specification
Acoustic glass
10.8mm Stadip Silence
Air gap
120mm decoupled cavity
Windows treated
5 openings
Install time
2 days on site
Verified outcome
DLR pass-bys now inaudible with windows shut.
"The rhythmic clack of the DLR has vanished — a huge relief."
Have a similar property in Greenwich?
Get a like-for-like quote based on this exact installation specification.