All case studies
Islington · N1·
Period conversion in Islington: 45dB noise reduction
How we cut overground railway line from 76dB to 31dB using 10.8mm Stadip Silence with a 120mm decoupled air gap.
Before
76 dB
After
31 dB
Reduction
45 dB
Installation specification
Acoustic glass
10.8mm Stadip Silence
Air gap
120mm decoupled cavity
Windows treated
3 openings
Install time
1 day on site
Verified outcome
Trains now barely audible at peak times.
"We hear the fridge more than the trains — a genuine transformation."
Have a similar property in Islington?
Get a like-for-like quote based on this exact installation specification.